Bids/ RFP's

-A A +A

See attachments for open bids. You can go to municibid.com for all surplus items available from the Town of Perryville.

RFP DATED JULY 11, 2018 - IMPLEMENTATION OF MS4 PERMIT 

Click on the named documents below to download (5 documents consisting of the RFP and Attachments A - D):

RFP July 11, 2018 - Implementation of MS4 Permit 

Note: the above document has been removed and replaced with the revised document dated July 12, 2018 below: 

RFP - Implementation of MS4 Permit - Revised July 12, 2018 - Note: use the Revised RFP in Addendum 1

Attachment A - MS4 Permit

Attachment B - Insurance Requirements

Attachment C - Price Proposal Form Note: use the Revised Attachment C in Addendum 1

Attachment D - Non-Collusion Form

Addendum 1 Dated July 25, 2018 is below:

http://www.perryvillemd.org/sites/perryvillemd/files/file/file/addendum_1_complete.pdf

Addendum 2 Dated July 25, 2018 is below:

http://www.perryvillemd.org/sites/perryvillemd/files/file/file/addendum_2.pdf

Addendum 3 Dated July 31, 2018 is below:

http://www.perryvillemd.org/sites/perryvillemd/files/file/file/addendum_3_0.pdf

 

 

SITE IMPROVEMENTS - PERRYVILLE TOWN HALL - PHASE II

Addendum 1, Dated June 15, 2018, consists of 2 documents, which are listed below as Ad-1 and Ad-1A

Ad-1

Ad-1A

 

Addendum 2, Dated June 27, 2018, consists of 7 documents, which are listed below as Ad-2, Ad-2A, Ad-2B, Ad-2C, Ad-2D, Ad-2E and Ad-2F.  All of the documents are posted below and can be downloaded.

Ad-2

Ad-2A

Ad-2B

Ad-2C

Ad-2D

Ad-2E

Ad-2F

Addendum 3, Dated June 29, 2018 consists of 1 document, Ad-3.  This document is below and can be downloaded.

Ad-3

 

Addendum 4, Dated July 6, 2018 consists of 1 document, Ad-4.  This document is below and can be downloaded.

Ad-4

Request for Qualifications

The Project is summarized as follows: The contractor shall implement the SITE IMPROVEMENTS for the PERRYVILLE TOWN HALL – PHASE II construction plan set as well as Design/Build the Little League Concession / Restroom Building (max. footprint 52’x23’) for the Town of Perryville. The design and construction of the building shall have three concept scenarios with associated cost estimates. The proposed building will be used for concessions, restrooms, and storage. The first is a single story building with attic storage. The second is a single story building with attic storage with a raised roof of an additional 3-4 feet for more storage capacity. The final scenario is a two story building, but the second story is only half the footprint of the ground floor level. The contractor shall then construct the appropriate Little League Concession / Restroom Building chosen by the Town of Perryville. The town is open to alternative building construction methods such as pre-fabrication as alternative proposals.

Please see Documents below named RFQ Field

 

 

AttachmentSize
rfq_field.pdf110.14 KB
rfq_field_perryville-phase2_and_3-plans-april2018.pdf50.29 MB
rfq_-_field_d-110_2016_rfq.pdf299.82 KB
rfq_field_qa.pdf80.05 KB